Home > Terms > Spanish, Latin American (XL) > ruta crítica
ruta crítica
The series of activities that determines the duration of the project. In a deterministic model, the critical path is usually defined as those activities with float less than or equal to a specified value, often zero. It is the longest path through the project.
0
0
Improve it
- Part of Speech: noun
- Synonym(s):
- Blossary:
- Industry/Domain: Software
- Category: Operating systems
- Company: מיקרוסופט
- Product:
- Acronym-Abbreviation:
Other Languages:
Member comments
Terms in the News
Featured Terms
Industry/Domain: Archaeology Category: Evolution
deriva genética
Changes in the frequencies of alleles in a population that occur by chance, rather than because of natural selection.
Contributor
Featured blossaries
stanley soerianto
0
Terms
107
Blossaries
6
Followers
Top Ten Coolest Concept Cars
Category: Other 2 10 Terms
Browers Terms By Category
- General art history(577)
- Visual arts(575)
- Renaissance(22)
Art history(1174) Terms
- Organic chemistry(2762)
- Toxicology(1415)
- General chemistry(1367)
- Inorganic chemistry(1014)
- Atmospheric chemistry(558)
- Analytical chemistry(530)
Chemistry(8305) Terms
- Economics(2399)
- International economics(1257)
- International trade(355)
- Forex(77)
- Ecommerce(21)
- Economic standardization(2)
Economy(4111) Terms
- Architecture(556)
- Interior design(194)
- Graphic design(194)
- Landscape design(94)
- Industrial design(20)
- Application design(17)
Design(1075) Terms
- Wireless networking(199)
- Modems(93)
- Firewall & VPN(91)
- Networking storage(39)
- Routers(3)
- Network switches(2)